# Client Contract No Title Location Start Date Completed Date Scope Of Work
1 MINISTRY OF ROYAL AIR DEFENSE 12/32 CONSTRUCTION OF HOUSING APARTMENTS 80 Housing Facilities for Airbase Dhahran February 2011 18 Months Construction of Housing Complex comprise Apartments - 08 Buildings - 10 Complete civil, mechanical, electrical HVAC work, Fire Alarm System, Gas System TV/Antenna System and communication System, parking lot with the required access roads
2 MADI M AL-HAJRI & PARTNERS CO CONSTRUCTION OF MODERN CRESCENT PLASTIC FACTORY 2nd Industrial Dammam February 2012 18 Months Construction of Factory Plant area, Warehouse area, Factory offices & Security office. Complete civil, mechanical, electrical, HVAC work, and Fire Alarm System and Factory boundary wall.
3 SAUDI ARAMCO OIL COMPANY 6600027434 COMMUNITY CENTER AT AL-HASA Al-Hasa July 2011 18 Months Contractor shall provide all supervision, labor, equipment, tools and materials to Complete the following: One 7,300SM adult soccer field with running tracks; One 1,400SM children's soccer field; Two 900SM swimming pools for female & male users; One
4 SAUDI ARAMCO OIL COMPANY 6600019269 (RELEASE PURCHASE ORDER) UNDER BUILDING TRADES Dhahran December 2008 48 Months Contractor shall provide all supervision, labor, equipment, tools and materials to complete the following: Excavation, backfilling and grading, construction, design, pre-cast concrete works, interior & exterior finishing.
5 MINISTRY OF DEFENSE AND AVIATION 2/6 /124A CONSTRUCTION OF FACILITIES, BRIGADE 17TH IN EASTERN REGION – PHASE 1 Dhahran July 2009 18 Months Construction of Facilities for Military Equipment Parking Shed and Wheeled Vehicle Parking Shed Site clearing, asphalt, backfilling and grading, construction, design, street lighting, with all related architectural, mechanical, and electrical works
6 SAUDI ARAMCO OIL COMPANY 6600022060 CONSTRUCTION NEW MUSSALLA FOR TE & SD AT DHAHRAN Dhahran April 2009 10 Months Contractor shall provide all supervision, labor, equipment, tools and materials to complete the following: Excavation, backfilling and grading, construction, design, pre-cast concrete works, interior & exterior finishing, with all related mechanical
7 SAUDI ARAMCO OIL COMPANY 6600020573 CONSTRUCTION OF NEW TD ADMIN BUILDING Dhahran June 2008 14 Months Contractor shall provide all supervision, labor, equipment, tools and materials to complete the following: Excavation, backfilling and grading, construction, design, interior and exterior finishing, communication works, fire alarm, HVAC works, pre-
8 MINISTRY OF DEFENSE & AVIATION 2-6-127/A CONSTRUCTION OF BATTALION COMMAND BUILDINGS IN EASTERN PROVINCE Dhahran August 2006 18 Months Construction of Battalion Site Work and Complete Finishing Works (Civil/Electrical/Mechanical) & Sewer Treatment Plant
9 SAUDI ARAMCO 6600012796 TANAJIB CHEMICAL STORE & PERMANENT POWER SUPPLY Tanajib April 2005 May 2006 Construction of Steel Building for open Chemical Storage, closed Hazardous Material Storage building, Two Floor Office Building, HVAC system, Switch Board, Panels, Transformers, Holding Tank, Chemical Storage Underground Tank – 20000 USG Capacity, Pa
10 SAUDI ARAMCO 6600005522 CONSTRUCTION OF MAINTENANCE GARAGE Abqaiq January 2003 August 2004 Demolition/Removal of existing heavy maintenance building no. 1040, Construction of new Maintenance Garage pre-engineered steel building, HVAC, Fire Protection, New Electrical/Distribution Equipment & New Communication Facilities, Installation of Ove
11 SAUDI ARAMCO 6600053190 FIRE TOWER TRAINING BUILDING & FIRE WATER SYSTEM Dhahran May 2002 April 2003 Fire Water Supply System • Fire Water Tank Installation • Fire Tower Training Center Building Construction
12 SAUDI ARAMCO 44610/00 COMMUNICATION BUILDING - HARADH - GOSP II Haradh September 10, 2001 December 25, 2002 Contractor shall provide all supervision, labor, equipment, tools and materials to complete the following: Site clearing and demolition, excavation, backfilling and grading, construction, design & installation of communicating tower, DC system, inst
13 SAUDI ARAMCO 44628/00 DESALINATED WATER SUPPLY Ad-Danah September 05, 2001 November 15, 2002 Contractor shall provide all supervision, labor, equipment, tools and materials to complete the following: Site preparation, design, construct & installation of water tanks (18M & 11M diameter), construction of pump station, complete mechanical work
14 SAUDI ARAMCO 44378/00 COMPLETION OF HOME OWNERSHIP LOTS INCIII, PH1B1, AL-HASA Al-Hasa September 05, 2001 November 15, 2002 Contractor shall provide all supervision, labor, equipment, tools and materials to complete the following: Site clearing & demolition, excavation, backfilling & grading, water system, street grading & paving, street walkway & lighting, utility adju
15 SAUDI ARAMCO 44408/00 NEW JUAYMAH MAIN GATE Juaymah March 05, 2000 August 2001 Contractor shall provide all supervision, labor, equipment, tools and materials to complete the following: Site preparation, detour construction & removal, trench excavation, backfill & surface reinstatement, performance of all required demolition o
16 ROYAL COMMISSION FOR JUBAIL & YANBU 570-C31 REMOVAL OF INTERIM B1 PUMP STATION AT JUBAIL INDUSTRIAL CITY Jubail November 2003 February 2004 Contractor shall provide all supervision, labor, equipment, tools and materials to complete the following: Removal of civil & structural items, removal of electrical items, removal of mechanical items including tanks, pump station, HVAC system etc.
17 MADI M. ALHAJRI & PARTNER CO. CONSTRUCTION OF MOSQUE 05/1999 02/2000 Construction of mosque, site grading, excavation, backfilling, foundation, columns, construction of mosque bldg w/ utilities, complete civil, electrical, & mechanical works including HVAC, telephone, public sound system
18 AL-HAJRI INDUSTRIAL WORKSHOP COMPLEX CONSTRUCTION OF WORKSHOP COMPLEX IN JUBAIL INDUSTRIAL CITY 01/1997 01/1999 331-D52 Site preparation & development, construction of roads, walk ways, parking areas, erection of street lighting, sign & signals & sign boards, constructing the utilities (such as electrical pipes, cables, sewage & water pipes, communication cabl
19 SILVER CRESCENT DISPENSARY CONSTRUCTION OF POLYCLINIC IN THOQBAH 08/1996 05/1998 Site preparation & development, excavation, leveling & filling, foundations, installation of electrical & HVAC, telephone, CATC, computer network system, fire alarm, fire fighting system, complete furniture & equipments, clinic & apartment accessorie
20 MADI M. ALHAJRI CONSTRUCTION OF MULTI STOREY VILLA IN ALKHOBAR 01/1994 11/1996 Site preparation & development, design & engineering work, excavation for foundations, columns, beams, walls, complete concrete structure & masonry works, total plumbing, electrical works, HVAC, telephone & CATV works, interior & exterior finishing,
21 SALINE WATER CONVERSION CORP. (S.W.C.C.) CONSTRUCTION & REPAIR OF CULVERTS IN JUBAIL-RIYADH HIGHWAY 05/1994 02/1995 Construction of culverts, repair of culverts, thrust boring works & provide to tunnel 30" steel sleeve pipes beneath the existing SWCC lines A & B, provide drainage culverts beneath construction of roads & walkways
22 MINISTRY OF DEFENCE & AVIATION (DIRECTORATE GENERAL OF MILITARY WORKS) MISSILE PROTECTION FACILITIES PROJECT (ALONG M&M CO. AS JOINT VENTURE) – PROJECT 13/12/1- D 02/1416 02/1418 Site preparation, soil improvement, patrol road, road construction & pavement including traffic signs, walkways, construction of public yards, retaining walls, storm water system for entire site, water supply, irrigation system, sewer system, electri
23 MINISTRY OF DEFENCE & AVIATION (DIRECTORATE GENERAL OF MILITARY WORKS) CONSTRUCTION OF MEDICAL WAREHOUSE COLD STORAGE IN DHAHRAN AIRBASE 01/1993 01/1994 Construction of medical warehouse, construction & installation of cold storage for medical items, safety equipment installation, complete mechanical/HVAC/electrica l works
24 MINISTRY OF RURAL AFFAIRS WATER & SEWAGE AUTORITY OF EASTERN PROVINCE CONSTRUCTION OF COMPUTER & EXHIBITION CENTER 11/1993 06/1997 Site preparation & development, grading, leveling & excavation for foundation, construction of RCC footings, grade beams, column, floor & total interior finishing, installation of mechanical, electrical, sewage, HVAC, telephone system, roadway & park
25 KING FAHD UNIVERSITY FOR PETROLEUM & MINERALS (KFUPM) DHAHRAN BUILDING ANNEXES PROJECT (DHAHRAN) 11/1993 10/1996 Site preparation, grading, leveling, excavation & backfilling for drainage, raw & clean water system electrical telephone, CATV system & construction of roads, walkways, retaining walls, supply & fix transformers, irrigation & landscaping works
26 ARABIAN PETROLCHEMICAL CO. PETROKEMYA OLEFINS PROJ. PROECT OFGO/A2-PO01358 05/1993 06/1993 Repair & maintenance program, removal of steel in area for repair, process system installation, cutting/ welding/fitting support structure & foundation
27 ARABIAN PETROLCHEMICAL CO INSTALLATION OF MISCELLANOUS FOUNDATION PROJECT OFGO/A2/PO00918 12/1992 02/1994 Construction of pipe supports & pipe foundations, miscellaneous steel structure & foundations-foundation for electrical & process instrumentation, installation of hose box, extinguisher & cabinet foundations
28 NATIONAL COMPANY FOR GLASS INDUSTRIAL ZOUJAJ CONSTRUCTION OF LABOR QUARTERS IN DAMMAM 12/1992 03/1993 Site preparation, construction of complete labor quarters, painting sanitary works, electrical works, roads & pavement, fencing & gates
29 ARABIAN PETROLCHEMICAL CO. PETROKEMYA OLEFINS PROJ. PROECT OFGO/VO-PO00913 08/1992 12/1992 Construction of miscellaneous, concrete footings & foundation
30 MINISTRY OF DEFENCE & AVIATION (DIRECTORATE GENERAL OF MILITARY WORKS) CONSTRUCTION OF AMMUNATION & WEAPON STORAGE STRUCTURE (IGLOO TYPE & ADMIN BLDG. - DHAHRAN 12/1992 05/1994 Site preparation, construction of re-informed concrete storage structureIGLOO type, concrete retaining walls & floors, antiblast doors & valves, security fencing, admin offices , mechanical & standby electrical system w/ generator units
31 MINISTRY OF DEFENCE & AVIATION (DIRECTORATE GENERAL OF MILITARY WORKS) CONSTRUCTION OF PRINCE SULTAN MOSQUE - HAFR AL-BATIN – PROJECT/M/7/15 03/1992 05/1993 Site preparation, foundation excavation, concrete foundations & walls, concrete structure complete, mosque tower, interior/exterior finishing, mechanical, electrical, utility & sanitary system, pre-cast concrete fence, landscaping & beautification wo
32 SAUDI ARABIAN MARKETING & REFINING CO. (SAMAREC) – SAUDI ARAMCO SAFETY & SECURITY IMPROVEMENTS AT DHAHRAN BULK PLANT TERMINAL FACILITIES PROJECT 90-PO267 10/1991 06/1992 Reinforced concrete protection walls for fuel tanks (spill containment), concrete footings & foundations, installation of fabric fence type SSD-1 – electrical system & lighting network, - asphalt pavingreinforced concrete collection basin for excess
33 DEPT. OF U.S. ARMY HQ – US ARMY CENTRAL COMMAND DISASSEMBLY/ASS EMBLY, CLEAN & PARK CLAMSHELL AIR CRAFT HANGERS PROJECT DASA01-91-C0057 08/1991 11/1991 Removal & disassemble clamshell structure inventory, clean & park clamshell structures & store, transport, reassemble & re-erect
34 ROYAL COMMISSION FOR JUBAIL & YANBU – DIRECTORATE OF JUBAIL WORKS P & C MATERIALS HANDLING CARRIDORS & NORTH-WEST PUMPING STATION PROTECTION SYSTEM PROJECT 149-C11 12/1990 09/1992 Construction of security fence – 26km, guard rails – 13.5km, concrete barriers – 1.3km, gate house building patrol road – 2.5km, security lighting system
35 MINISTRY OF DEFENCE & AVIATION (DIRECTORATE GENERAL OF MILITARY WORKS) CONSTRUCTION OF WAREHOUSE FOR MILITARY USE – HAFR AL-BATIN – PROJECT 2/12/15 01/1990 06/1991 Grading & preparation of the site, construction of steel buildings, concrete footings, foundation & floor, asphalt paving (roads & parking), construction of maintenance building, electrical system & lighting, safety equipments, chain link fence SSD-1
36 MINISTRY OF DEFENCE & AVIATION (DIRECTORATE GENERAL OF MILITARY WORKS) CONSTRUCTION OF STEEL SHELTER FOR HEAVY & LIGHT TRUCKS & CARS – KING FAHD MILITARY CITY DHAHRAN 04/1989 04/1990 Grading &site preparation, backfilling works, construction of steel buildings (06nos.), asphalt paving total area 25,000sq.m., concrete floor 9,000sq.m., concrete foundation & footings, construction of maintenance building, electrical system & lighti
37 MINISTRY OF DEFENCE & AVIATION (DIRECTORATE GENERAL OF MILITARY WORKS) UPGRADING OF HALF MOON RECREATION CENTER 08/1989 04/1991 Grading & site preparation, construction of beach umbrellas w/ concrete floor & grid irons, water tanks, lighting of the site & electrical system, irrigation works, construction of roads & parking lots of the site & chain link fence length 550LM, lan
38 MINISTRY OF DEFENCE & AVAITION (ROYAL AIR DEFENCE FORCES) CONSTRUCTION OF BUILDINGS FOR HEAVY & LIGHT VEHICLES PARKING LOT – ABQAIQ SITE PROJECT# 23/M/407 01/1989 07/1989 Grading & preparation of site, backfilling & compaction, concrete foundation & footings, construction of concrete buildings, asphalt paving (roads & parking), chain link fence around the site
39 SALINE WATER CONVERSION CORP. (S.W.C.C.) PERIMETER SECURITY FENCE SSD-1 FOR KHOBAR DESALINATION PLANT SEASIDE 01/1989 07/1989 Removal of old fence, concrete foundation & footings, site preparation, installation of new chain link fence type SSD-1 & single & double leaf gates, installation of barbed wire type, lighting system
40 SALINE WATER CONVERSION CORP. (S.W.C.C.) 01/1988 01/1989 Removal of old fence, concrete foundation & footings, site preparation, installation of new chain link fence type SSD-1 & single & double leaf gates, installation of barbed wire type, lighting system
41 SALINE WATER CONVERSION CORP. (S.W.C.C.) PERIMETER SECURITY FENCE SSD-1 CHAINLINK FABRIC FENCE FOR JUBAIL DESALINATION PLANT (SEA SIDE 11/1987 09/1988 Removal of old fence, concrete foundations and footings, installation of new chain link fence type SSD-1 single & double leaf gates, installation of barbed wire, guardhouse & gates, electrical system & lighting
42 NATIONAL GUARD DEPUTY HQ OF EASTERN PROVINCE PERIMETER PRECAST FENCE FOR NATIONAL GUARD COMPOUND IN DAMMAM 10/1987 03/1989 Removal of old fence, grading & preparation of site concrete footings & foundations construction & erection of pre-cast concrete fence by total length 12km
43 SALINE WATER CONVERSION CORP. (S.W.C.C.) PRECAST CONCRETE FENCE FOR THE TANK OF STORAGE AREA – JUBAIL CITY 10/1986 06/1987 Removal of old fence, concrete foundation & footings, construction of precast concrete fence, guardhouse & gates, electrical system & lighting
44 MINISTRY OF DEFENCE & AVAITION (ROYAL AIR DEFENCE FORCES) CONSTRUCTION OF BUILDING FOR HEAVY & LIGHT VEHICLES PARKING LOT – ABU ALI – JUBAIL SITE 11/1986 09/1987 Grading & preparation of site, backfilling & compaction, concrete foundation & footings, construction of concrete buildings, asphalt paving (roads & parking), chain link fence around the site including gates & watch towers, beautification of site & l
45 MINISTRY OF DEFENSE AND AVIATION (MODA) 2/6/134 CONSTRUCTION OF FACILITIES FOR LAND FORCES AVIATION GROUP Dharan January 2011 24 Months Construction of Facilities for Land Forces Aviation Group Site Work and Complete Finishing Works (Civil/Electrical/Mechanical/Communication Fire System, Suppression System, Helipad Lighting System & Asphalt Works), parking lot with the required acces